I & C Engineering and Process Control
Consulting
- Solution orientated consulting for Automation Technology queries
- Analysis of the initial situation
- Concept proposal and planning
- Complete automation concept
- Control and monitoring plans
- Power supply concept
- Cost estimate
- Technical specifications, requirement specifications, bidding (also according to the Fee Structure for Architects and Engineers)
- System evaluation
Project Management
- Project planning
- Division of sub-processes, timetable
- Resource planning (the right people at the right time)
- Consideration of individual circumstances and dependencies
- Planning process despite missing parameters
- No repetition of work
- Monitoring and Controlling
Engineering
BASIC-Engineering
Sensor and actuator overview, neutral equipment, I & C Engineering equipment valve, inductor and level evaluation, enquiries, selections, order PCS BOM (Bill of Materials)
Function and Signal Planning
Analogue and binary signals, flag and calculated sizes, limit and priority application, PCS/PLC in and outputs, function blocks, signal elements and chains, signal data export files for control systems, visualization contents, planning of PLC/PCS systems.
DETAIL-Engineering
I & C Engineering connection diagram, cable and terminal diagrams, wiring diagram, electronics cabinet assembly plan (template library), template supported data input (scalable for large and small projects), network planning and design, hardware, operating system, software
Installation Planning
Punctual and up to date installation planning takes into account all modifications online and means you can always calculate your costs exactly. Our planning tools and their standard database models mean that all the necessary lists are produced daily for you.
- Input data from metering points lists (sensor/actuator lists)
- Configuration schedule
- Specification of installation requirements
- Mechanical pipeline integration
- Cabling planning e.g. via distribution box
- Backup arrangement via trunk cable
- Typical based categorization (Hook-Up)
- Bill of materials
- Procurement optimization (high cost small parts)
- Increased/reduced quantity lists because of requirement changes
- Logistics, allocation to plant sections
System Installation, System Integration und Launch
- Hardware & software installation
- System with entire IT structure
- PCS-configuration or migration
- FAT (performance test, locally or at the plant)
- TFK (Technical Function Control)
- IBN (warm startup)
- Launch monitoring
Information Management and Optimization
- Process data validation
- Characteristic calculation
- Drawing up of balance sheet
- Data transfer to maintenance systems
- Data use for process optimization
- Data analysis of faults and errors





